Friday, August 28, 2009

Closed

I've decided not to model the CSX Downtown spur completly. So, you get it.

Monday, August 17, 2009

Test Layout

Dern I guess I double posted sort of. I would like to say. I am at a problem. I am thinking about modeling Norfolk Southern's Somerset branch in western Pennsylvania. But to find out what I want to model. I am going to be taking a 4'5" by 3' something. I want to model the Norfolk Southern Railway on one half and CSX downtown spur on the other.

Friday, August 7, 2009

Construction


I planned where I will be doing construction for the year 2009 and 2010.


I have now drawn out the section of work I will be working for the years of 2009 and 2010.

Tuesday, August 4, 2009

Problems with track planning

After taking a trip to the spare bedroom, I have discovered that the room is a little smaller that originaly thought. The door on the left side of the drawing, is much smaller than in the drawings. So, I have to re-design a whole new template for the room, thus, making the first two drafts of the Downtown spur, unusable.

Monday, August 3, 2009

Second Draft, with goddies


Another Track plan

Trackplan: First Draft


As of now, the layout is in the planning stages. I am, with the help of Lance Mindheim, am working on a plan. The track plan isn't to scale, or will it be a final one. I, with the small spare bedroom, don't have the space to model all of the Downtown spur, I will not be able to model three industries, Antillean Marine, Miami Iron & Metal, and FP&T. Here's the track plan.
Unmarked spurs are abandoned, with the exeption of the spur that is near Sun Gas, which I belive is apart of the industry.


Welcome

Hello and welcome to my blog. It will be used to show progress of my N scale layout, based on the CSX Downtown Spur.